SIEMENS:
|
|
|
138 - 88 / 22 KV, 30/60 MVA - Guido
Cálói Substation - Line 5 - CPTM, Overall
work Planning and Assembly
|
|
|
BALFOUR
BEATTY:
|
|
|
Rectifier and Auxiliary Substation
- Line 5 - CPTM, Assembly Supervision
|
|
|
SPECTRA
TELECOM DO BRASIL:
|
|
|
Station and Switching Implementation
Coordination, Planning and Inspection:
Mobile Telephone Switch Office (MTSO) Equipment Assembly
Planning Management and Inspection: Lapa, Guarulhos,
Penha and Santos, and Radio Base Stations: Lapa,
Guarulhos, Penha and Baixada Santista -Equipment: LUCENT
/ Operation: VESPER.
|
|
|
SCHNEIDER
ELECTRIC:
|
|
|
4,000 kW - 825 V.D.C. Rectifier Group
Commissioning Testing and assembly Supervision Supply
for Tucuruvi, Jardim São Paulo and Parada Inglesa
Rectifier Substations on Northern Extension
|
|
|
ADTRANZ:
|
|
|
CPTM
CPTM - Supervision, revision and testing on ATC System
of the trains, Series 1700:
----- Overall work
timetable preparation together with ADtranz
----- Overall work
supervision, both in the ADtranz and FAÇON workshops
----- Equipment transport
----- Overall panel
equipment and component revision
----- Mounted Panels
workbench testing
----- Train Tests
participation
----- 22 kV system
and direct current Circuit breaker assembly supervision
for Zuquim
----- Rectifier Substation
Northern Extension - São Paulo Subway----
----- Trains Equipment
Installation
----- ATC System:
Supervision, Revision and Equipment Testing
|
|
|
|
| |
|
|
|